Home/Localities/Ambattur–Avadi Belt/Construction of Group Development of 6 Blocks – Block-1: Stilt Fl…

Construction of Group Development of 6 Blocks – Block-1: Stilt Fl…

TN/29/Building/0337/2020PAST COMMITTED DATE

Construction of Group Development of 6 Blocks – Block-1: Stilt Fl… is registered with TNRERA as TN/29/Building/0337/2020 (Building registration, 2020). The promoter is THE EXECUTIVE ENGINEER & ADO, who has 40 projects on the TNRERA register. The RERA-committed completion date is 31 Dec 2022 — that date has now passed. Committed dates are legally binding under RERA.

17 Sep 2020
31 Dec 2022
205
0

Latest quarterly progress filing — September 2023

100%
43%

Stage, as filed: Block/Tower, Floor wise Block‐1 to Block 6

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
2BHK4,2621

Machine-read from the filed carpet-area statement (low OCR confidence — verify against source). Normalised to sq.ft. View the original document filed with TNRERA ↗

About this registration

Construction of Group Development of 6 Blocks – Block-1: Stilt Floor + 5 Floors with 25 dwelling units; Block-2: Ground Floor + 4 Floors with 40 dwelling units; Block-3: Stilt Floor + 5 Floors with 30 dwelling units; Block-4: Ground Floor + 4 Floors with 40 dwelling units; Block-5: Ground Floor + 5 Floors with 50 dwelling units; Block-6: Stilt Floor + 5 Floors with 20 dwelling units with Total – 205 dwelling units (160 MIG & 45 MIG), 10th Street, Chennai, Comprised in (i) Old S.No.254/2B, 255 part, 256/1B1 part, 1B2 part, 258/20 part, 32 part, T.S.No.42, (ii) Old S.No.255 part, 256/1B1 part, 1B2 part, T.S.No.43/2 and (iii) S.No.253/1 part, T.S.No.43/3, Block No.21 of Padi Village, Chennai.

Approval: Planning Permission No. B/NHRB/231 A to G/2020 issued by CMDA in Letter No. PP/NHRB/N/045/2020, dated 07.08.2020. Greater Chennai Corporation issued the Building Permission in Letter No. CEBA/WDCN07/00302/2020, dated 03.

Status on register: Progress of Work as on September 2023

Builder track record: THE EXECUTIVE ENGINEER & ADO

THE EXECUTIVE ENGINEER & ADO has 40 projects on the TNRERA register since 2018, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Group Development of 6 Blocks – Block-1: Stilt Fl… RERA registered?

Yes — registered with TNRERA as TN/29/Building/0337/2020 in 2020. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Group Development of 6 Blocks – Block-1: Stilt Fl… be completed?

The RERA-committed completion date is 31 Dec 2022. No deadline extensions are on record.

Who is the builder of Construction of Group Development of 6 Blocks – Block-1: Stilt Fl…?

THE EXECUTIVE ENGINEER & ADO, with 40 projects on the TNRERA register and no completion-date extensions on record.

← All Ambattur–Avadi Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.