VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/BRIGADE TECH BOULEVARD

BRIGADE TECH BOULEVARD

TN/35/Building/0317/2024REGISTERED

BRIGADE TECH BOULEVARD is registered with TNRERA as TN/35/Building/0317/2024 (Building registration, 2024). The promoter is i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini. The RERA-committed completion date is 29 Dec 2029 (about 42 months away). Committed dates are legally binding under RERA.

20 Mar 2024
29 Dec 2029
0

From the detailed register filing

Under Construction
High Rise Building(HRB)
20525

Planning permission issued by Member Secretary CMDA (No. 15608-PP/HRB/29/2023/A-Q) on 27 Oct 2023.

About this registration

Project Name: BRIGADE TECH BOULEVARD Registration of High Rise Group Development with consisting of Extended combined double Basement floor comprising with 2 Blocks: Block 1: Ground floor (Retail shop, cafeteria) + 12 floors, Block 2: Ground floor (Retail shop, cafeteria) + 12 floors and Block 3 (MLCP): Basement + 6 level + Terrace level (Two wheeler parking) with IT/ITES Building at Pallavaram – Thoraipakkam 200 feet Radial Road (MMRD Road), Pallavaram Chennai-600043 comprised in Old S.No.109/1A1, 1A2, 1A3, 1B, 2A1, 2B, 3, 3A2, 3A3, 114/5C, 115/2C, 116/3, 116/4B, 116/4B2, 116/5, 116/8A, 116/8B, 116/11, 116/12A, 116/12B, T.S. Nos. 5/1, 6/1, 9/1, 9/2, 10, 11/1, 11/2, 13, 15, 17, 18, 19, 20, 2

Approval: The Member Secretary, CMDA issued planning permission No.PP/HRB/29/2023/A to Q in Lr.No.CMDA/PP/HRB/S/0275/2023 Dated 27/10/2023. The Commissioner, Tambaram Corporation issued Building License No: 009/BL/2024/02/021/0030

Builder track record: i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Fo

i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.

Frequently asked

Is BRIGADE TECH BOULEVARD RERA registered?

Yes — registered with TNRERA as TN/35/Building/0317/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will BRIGADE TECH BOULEVARD be completed?

The RERA-committed completion date is 29 Dec 2029. No deadline extensions are on record.

Who is the builder of BRIGADE TECH BOULEVARD?

i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini.

← All OMR Corridor projects and market data

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.