GOLDEN TOWERS
GOLDEN TOWERS is registered with TNRERA as TN/29/Building/0610/2024 (Building registration, 2024). The promoter is M/s. GLAZE ENTERPRISEZ, Rep. by its Partner Thiru.C.CHIRANJEEV, POWER AGENT OF 1. VASUDEVEAN, 2.G.MURALI, 3. G.PARAMESHWARI, 4. E.ANBARASI, 5.K.VITHIYA, 6. E. MOHAN KUMAR AND 7. E.YAMUNADEVI, Door No.2/94, Nattu Pillayar Koil Street, Sowcarpet, Chennai, Tamil Nadu-600001.. The RERA-committed completion date is 15 May 2029 (about 34 months away). Committed dates are legally binding under RERA.
From the detailed register filing
Planning permission issued by CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY (No. OL-PP/HRB/0010/2023) on 7 Nov 2023, valid until 6 Nov 2031.
About this registration
Project Name: GOLDEN TOWERS Registration of the proposed construction of Group development of High Rise Building (HRB) consisting of 2 Blocks, Block 1: Stilt floor + 9 floors + 10th floor part with 33.00m height (FGL to top of terrace) Residential building with 46 dwelling units & Block 2: Stilt floor + 12 floors with 39.0m height (FGL to top of terrace) Residential building with 59 dwelling units, Totally 105 dwelling units and Open Swimming Pool along with Shower and Dress Change Room (Ground floor) at New Kumaran Nagar Main Road, Sholinganallur, Chennai- 600 097 comprised in Survey No.270/1 of Sholinganallur Village, Tambaram Taluk, within the limits of Greater Chennai Corporation, Kanche
Approval: CMDA/PP/HRB/S/0418/2022, Dated: 07.11.2023. Planning Permission No.: OL-PP/HRB/0010/2023, Permit No.: OL- 00591 Dated: 07.11.2023, The Commissioner, Greater Chennai Corporation issued building permission in Letter No. CE
Builder track record: M/s. GLAZE ENTERPRISEZ, Rep. by its Partner Thiru.C.CHIRANJE
M/s. GLAZE ENTERPRISEZ, Rep. by its Partner Thiru.C.CHIRANJEEV, POWER AGENT OF 1. VASUDEVEAN, 2.G.MURALI, 3. G.PARAMESHWARI, 4. E.ANBARASI, 5.K.VITHIYA, 6. E. MOHAN KUMAR AND 7. E.YAMUNADEVI, Door No.2/94, Nattu Pillayar Koil Street, Sowcarpet, Chennai, Tamil Nadu-600001. has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.
Frequently asked
Is GOLDEN TOWERS RERA registered?
Yes — registered with TNRERA as TN/29/Building/0610/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.
When will GOLDEN TOWERS be completed?
The RERA-committed completion date is 15 May 2029. No deadline extensions are on record.
Who is the builder of GOLDEN TOWERS?
M/s. GLAZE ENTERPRISEZ, Rep. by its Partner Thiru.C.CHIRANJEEV, POWER AGENT OF 1. VASUDEVEAN, 2.G.MURALI, 3. G.PARAMESHWARI, 4. E.ANBARASI, 5.K.VITHIYA, 6. E. MOHAN KUMAR AND 7. E.YAMUNADEVI, Door No.2/94, Nattu Pillayar Koil Street, Sowcarpet, Chennai, Tamil Nadu-600001..
← All OMR Corridor projects and market data
Shortlisting here? Verify before you pay.
We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.