VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Porur Belt/ARA VINESH ENCLAVE

ARA VINESH ENCLAVE

TN/29/Building/0326/2024PAST COMMITTED DATE

ARA VINESH ENCLAVE is registered with TNRERA as TN/29/Building/0326/2024 (Building registration, 2024). The promoter is M/s. ARA CONSTRUCTION, who has 2 projects on the TNRERA register. The RERA-committed completion date is 31 Dec 2025 — that date has now passed. Committed dates are legally binding under RERA.

4 Apr 2024
31 Dec 2025
55
0

From the detailed register filing

Under Construction
Non-High Rise Building(NHRB)
2225.75

Planning permission issued by CMDA (No. OL-PP/NHRB/0107/2023) on 18 Mar 2023, valid until 17 Mar 2031.

About this registration

Project Name: ARA VINESH ENCLAVE Residential building consisting of 2 Blocks, Block A- Stilt Floor + 5 Floors (Height - 18.30 m) with 25 Dwelling units, Block B - Stilt Floor + 5 Floors (Height - 18.30 m) with 30 Dwelling units totally 55 dwelling units with availing premium FSI at T Ponnambalam Salai, Kulapakkam, Chennai comprised in S.No. 116/2 of Kulapakkam village within the limits of Kundrathur Panchayat union Chennai District.

Approval: The Member Secretary, CMDA issued Planning permission No. OL-PP/NHRB/0107/2023 in Letter No. CMDA/PP/NHRB/C/0330/2022 dated 18/03/2023. The President, Kulapakkam Panchayat, Kundrathur Panchayat union issued Building perm

Builder track record: M/s. ARA CONSTRUCTION

M/s. ARA CONSTRUCTION has 2 projects on the TNRERA register since 2019, with no completion-date extensions on record. See the full record →

Frequently asked

Is ARA VINESH ENCLAVE RERA registered?

Yes — registered with TNRERA as TN/29/Building/0326/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will ARA VINESH ENCLAVE be completed?

The RERA-committed completion date is 31 Dec 2025. No deadline extensions are on record.

Who is the builder of ARA VINESH ENCLAVE?

M/s. ARA CONSTRUCTION, with 2 projects on the TNRERA register and no completion-date extensions on record.

← All Porur Belt projects and market data

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.