Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9…
Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9… is registered with TNRERA as TN/29/Building/0159/2022 (Building registration, 2022). The promoter is The Executive Engineer, TNSCB, Vellore Division, who has 7 projects on the TNRERA register. The RERA-committed completion date is 30 Apr 2024 — that date has now passed. Committed dates are legally binding under RERA.
A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.
Apartment sizes (carpet area)
RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.
Carpet areas range from 276 to 276 sq.ft (median 276 sq.ft) across 201 units.
1% of units have a balcony on the filed area statement, typically around 17 sq.ft.
Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗
About this registration
Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9 Floors with 162 Tenements in each Block and by totalling 324 Tenements comprised in T.S.No.6580/1pt, Block No.141 of T.Nagar Village, Guindy Taluk, Chennai District and Stilt Floor + 4 Floors existing Office building at Alaiyamman Koil, Teynampet, Mylapore, Chennai – 600018 comprised in T.S.No.3819pt, Block No.75 of Mylapore Village, Mylapore Taluk, Chennai District.
Approval: Planning Permission issued by The Member Secretary / CMDA / Chennai vide Letter No. C3(S)/566/2021, dated 19.03.2022. Building Permission issued by The Executive Engineer (T.P.) / Greater Chennai Corporation / Chennai vi
Status on register: Completed
Builder track record: The Executive Engineer, TNSCB, Vellore Division
The Executive Engineer, TNSCB, Vellore Division has 7 projects on the TNRERA register since 2020, with no completion-date extensions on record. See the full record →
Frequently asked
Is Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9… RERA registered?
Yes — registered with TNRERA as TN/29/Building/0159/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.
When will Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9… be completed?
The RERA-committed completion date is 30 Apr 2024. No deadline extensions are on record.
Who is the builder of Construction of Two Blocks of (Block-A1 & Block-A2) Stilt Floor + 9…?
The Executive Engineer, TNSCB, Vellore Division, with 7 projects on the TNRERA register and no completion-date extensions on record.
← All Central Chennai projects and market data
Source documents on TNRERA
These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.