M/s. EMERALD HAVEN REALTY LIMITED, First floor, Greenways Tower

M/s. EMERALD HAVEN REALTY LIMITED, First floor, Greenways Tower has 3 projects on the TNRERA register since 2019 — 72 units/plots in total, concentrated in OMR Corridor, Sriperumbudur–Oragadam. 0 completion-deadline extensions are recorded across their projects, and 1 projects are past their committed completion dates on the register. All figures from TNRERA public records.

3
2019
72
0

Builder Performance Dashboard

Computed from TNRERA register entries only — every metric's method is stated below it. Register status can lag reality; treat as one research input.

67%
0%
0
53 mo

Marked completed: share of their 3 registrations whose register status reads “Completed” (TN-wide: 81%) — note this naturally tracks portfolio age; a builder whose projects are mostly recent will show a low share without it meaning delay. Deadline extended: share with a recorded completion-date extension or “Extension given” status (TN-wide: 0%). Past date, not completed: projects whose RERA-committed date has passed without a “Completed” status, of 2 with a known committed date. Avg committed timeline: mean months between registration and committed completion, where both dates are on record.

All TNRERA registrations by M/s. EMERALD HAVEN REALTY LIMITED, First floor, Gr

ProjectRERA No.LocalityYearCommitted byUnits
TVS Emerald Aaranya Phase-I TN/01/Building/247/2022 OMR Corridor 2022 30 Apr 2027 16
TVS Emerald Aaranya TN/01/Layout/1842/2022 OMR Corridor 2022 DONE
Flourish TN/01/Building/041/2019 Sriperumbudur–Oragadam 2019 13 Mar 2023 56 DONE

How to read this record

Does M/s. EMERALD HAVEN REALTY LIMITED, First floor, Greenways Tower deliver on time?

No completion-deadline extensions are recorded across their 3 registered projects — a clean register on this measure.

Where does M/s. EMERALD HAVEN REALTY LIMITED, First floor, Greenways Tower build?

Their registrations concentrate in OMR Corridor, Sriperumbudur–Oragadam.