VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/BRIGADE TECH BOULEVARD

BRIGADE TECH BOULEVARD

TN/35/Building/0317/2024REGISTERED

BRIGADE TECH BOULEVARD is registered with TNRERA as TN/35/Building/0317/2024 (Building registration, 2024). The promoter is i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini. The RERA-committed completion date is 29 Dec 2029 (about 41 months away). Committed dates are legally binding under RERA.

20 Mar 2024
29 Dec 2029
0

From the detailed register filing

Under Construction
High Rise Building(HRB)
20525

Planning permission issued by Member Secretary CMDA (No. 15608-PP/HRB/29/2023/A-Q) on 27 Oct 2023.

About this registration

Project Name: BRIGADE TECH BOULEVARD Registration of High Rise Group Development with consisting of Extended combined double Basement floor comprising with 2 Blocks: Block 1: Ground floor (Retail shop, cafeteria) + 12 floors, Block 2: Ground floor (Retail shop, cafeteria) + 12 floors and Block 3 (MLCP): Basement + 6 level + Terrace level (Two wheeler parking) with IT/ITES Building at Pallavaram – Thoraipakkam 200 feet Radial Road (MMRD Road), Pallavaram Chennai-600043 comprised in Old S.No.109/1A1, 1A2, 1A3, 1B, 2A1, 2B, 3, 3A2, 3A3, 114/5C, 115/2C, 116/3, 116/4B, 116/4B2, 116/5, 116/8A, 116/8B, 116/11, 116/12A, 116/12B, T.S. Nos. 5/1, 6/1, 9/1, 9/2, 10, 11/1, 11/2, 13, 15, 17, 18, 19, 20, 2

Approval: The Member Secretary, CMDA issued planning permission No.PP/HRB/29/2023/A to Q in Lr.No.CMDA/PP/HRB/S/0275/2023 Dated 27/10/2023. The Commissioner, Tambaram Corporation issued Building License No: 009/BL/2024/02/021/0030

Builder track record: i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Fo

i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.

Frequently asked

Is BRIGADE TECH BOULEVARD RERA registered?

Yes — registered with TNRERA as TN/35/Building/0317/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will BRIGADE TECH BOULEVARD be completed?

The RERA-committed completion date is 29 Dec 2029. No deadline extensions are on record.

Who is the builder of BRIGADE TECH BOULEVARD?

i) M/s. BRIGADE ENTERPRISES LTD, ii) M/s.Agni Estates and Foundations Pvt Ltd, iii) Tmt.Rohini.

← All OMR Corridor projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.