VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/North Chennai/Thilag

Thilag

TN/29/Building/461/2022COMPLETED

Thilag is registered with TNRERA as TN/29/Building/461/2022 (Building registration, 2022). The promoter is 1) M/s. Thilaga Construction (P) Ltd., Rep. by its Managing Director, Thiru. S.Karunanithi. The RERA-committed completion date is 1 Oct 2023 — that date has now passed. Committed dates are legally binding under RERA.

9 Nov 2022
1 Oct 2023
12
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Project Name: “Thilag’s Arika” - Construction of Registration of Demolition and Reconstruction of Stilt Floor + 3 Floors Residential Building with 12 Dwelling Units at D.No.1 Part (Northern Portion), Big Street, Ponniammanmedu Main Road, Chennai – 600110 comprised in Old S.No.1197 part, New S.No.1197/2 part, as per Patta Old S.No.1197/1A1 part, T.S.No.41/2, Block No.95, Ward–D of Madhavaram Village within the limit of Greater Chennai Corporation.

Approval: The Executive Engineer (T.P), Greater Chennai Corporation issued Planning Permit No. PPA/WDCN03/06693/2022, dated 28.06.2022. The Executive Engineer (T.P), Greater Chennai Corporation issued Building Permission No. BA/WD

Status on register: Completed

Builder track record: 1) M/s. Thilaga Construction (P) Ltd., Rep. by its Managing

1) M/s. Thilaga Construction (P) Ltd., Rep. by its Managing Director, Thiru. S.Karunanithi has 1 project on the TNRERA register since 2022, with no completion-date extensions on record.

Frequently asked

Is Thilag RERA registered?

Yes — registered with TNRERA as TN/29/Building/461/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Thilag be completed?

The RERA-committed completion date is 1 Oct 2023. No deadline extensions are on record.

Who is the builder of Thilag?

1) M/s. Thilaga Construction (P) Ltd., Rep. by its Managing Director, Thiru. S.Karunanithi.

← All North Chennai projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.