TN/29/Building/419/2022PAST COMMITTED DATE

ICIPL Swarn is registered with TNRERA as TN/29/Building/419/2022 (Building registration, 2022). The promoter is M/s. Intouch Construction and Infrastructure Private Limited, Rep. by its Managing Director, Thiru. P.Vijaikumar. The RERA-committed completion date is 31 Mar 2024 — that date has now passed. Committed dates are legally binding under RERA.

13 Oct 2022
31 Mar 2024
0

Latest quarterly progress filing — December 2023

Caution: the RERA-committed completion date has passed, and the last quarterly filing reported 85% physical completion. Ask the builder for the current status and updated timeline before paying anything.

85%
85%

Stage, as filed: Block/Tower, Floor wise completed.

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

About this registration

Project Name: “ICIPL Swarn” - Construction of Registration of Stilt Floor + 3rd Floor (Part) Residential Building at Plot Nos.23 and 24, Vijaya Lakshmi Nagar, Korattur Village, Chennai comprised in S.Nos.760/4, 760/5B, 760/6, T.S.Nos.10/33, 10/35, 10/36, 10/4, 10/32, 10/34 (as per Document), S.Nos.760/2, 760/3B, 760/3B part, 4B, 4B part, 5A, 5A part, 5B, 2, 6, 763/2 part, T.S.Nos.10/4, 10/32, 10/33, 10/34, 10/35, 10/36 (as per Patta), Block No.9, Ward-E of Korattur Village, Ambattur Taluk within the limit of Greater Chennai Corporation.

Approval: CMDA issued Planning Permission No. PP/NHRB/145/2022/A & B in Letter No. PP/NHRB/N/027/2022, dated 26.05.2022. The Executive Engineer (T.P), Greater Chennai Corporation issued Building Permission No. CEBA/WDCN07/00184/20

Status on register: Progress of Work as on December 2023

Builder track record: M/s. Intouch Construction and Infrastructure Private Limited

M/s. Intouch Construction and Infrastructure Private Limited, Rep. by its Managing Director, Thiru. P.Vijaikumar has 1 project on the TNRERA register since 2022, with no completion-date extensions on record.

Frequently asked

Is ICIPL Swarn RERA registered?

Yes — registered with TNRERA as TN/29/Building/419/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will ICIPL Swarn be completed?

The RERA-committed completion date is 31 Mar 2024. No deadline extensions are on record.

Who is the builder of ICIPL Swarn?

M/s. Intouch Construction and Infrastructure Private Limited, Rep. by its Managing Director, Thiru. P.Vijaikumar.

← All Ambattur–Avadi Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.