VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/Construction of Registration of Block-C consisting of Stilt Floor p…

Construction of Registration of Block-C consisting of Stilt Floor p…

TN/29/Building/219/2022REGISTERED

Construction of Registration of Block-C consisting of Stilt Floor p… is registered with TNRERA as TN/29/Building/219/2022 (Building registration, 2022). The promoter is M/s. Futura Tech Park Private Limited. The RERA-committed completion date is —. Committed dates are legally binding under RERA.

17 Jun 2022
0

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

Carpet areas range from 250 to 3,602 sq.ft (median 825 sq.ft) across 11 units.

25% of units have a balcony on the filed area statement, typically around 250 sq.ft.

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of Registration of Block-C consisting of Stilt Floor part + G.F part + 1st Floor to 9th Floors IT/ITES building to the existing Block-A and Block-B at Rajiv Gandhi Salai (OMR), Sholinganallur, Chennai - 600119 comprised in S.Nos.456/8A1, 8A2, 8A3, 9A1A1, 9A2A, 457/7A, 7B, 7C, 7D, 7E, 8A, 8B, 8C, 8D, 8E, 9A, 9B, 10A, 10B, 458/1F, 1G, 1H, 1I, IJ, IK, 606/2, 3, 4, 607/4A, 4B, 4C, 4D, 4E of Sholinganallur Village, Chennai.

Approval: CMDA issued Planning Permission No. C/PP/MSB-IT/25 (A to F)/2019 in Letter No. C3/(S)/17070/2017, dated 24.05.2019. The Greater Chennai Corporation issued Building Permission No. CEBA/WBCM/15/00132/2019, dated 21.06.2019

Status on register: Completed

Builder track record: M/s. Futura Tech Park Private Limited

M/s. Futura Tech Park Private Limited has 1 project on the TNRERA register since 2022, with no completion-date extensions on record.

Frequently asked

Is Construction of Registration of Block-C consisting of Stilt Floor p… RERA registered?

Yes — registered with TNRERA as TN/29/Building/219/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Registration of Block-C consisting of Stilt Floor p… be completed?

The RERA-committed completion date is —. No deadline extensions are on record.

Who is the builder of Construction of Registration of Block-C consisting of Stilt Floor p…?

M/s. Futura Tech Park Private Limited.

← All OMR Corridor projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.