VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Chennai District/VINOTH VENYA

VINOTH VENYA

TN/29/Building/0449/2024REGISTERED

VINOTH VENYA is registered with TNRERA as TN/29/Building/0449/2024 (Building registration, 2024). The promoter is M/s. Vinoth Builders, who has 2 projects on the TNRERA register. The RERA-committed completion date is 31 Mar 2029 (about 32 months away). Committed dates are legally binding under RERA.

16 Aug 2024
31 Mar 2029
9
0

From the detailed register filing

Under Construction
Non-High Rise Building(NHRB)
505.48

Planning permission issued by GREATER CHENNAI CORPORATION (No. WDC NO.PPA/WDCN11/01462/2024) on 26 Feb 2024.

About this registration

Project Name: VINOTH VENYA Registration of Stilt Floor + 3 Floors Residential Non High Rise Building with 9 Dwelling Units at Plot No.8, Samuel Nagar, Perumal Koil Street, Balwadi Street Extension, Nerkundram, Chennai comprised in S.No.72/1A1B of Nerkundram Village, Maduravoyal Taluk, within Greater Chennai Corporation limits, Chennai District.

Approval: Assistant Executive Engineer, Greater Chennai Corporation issued planning permission in Letter No. PPA/WDCN11/01462/2024, Dated: 08/04/2024 and building permission vide Letter No. BA/WDCN11/02295/2024, Dated: 08/04/2024.

Builder track record: M/s. Vinoth Builders

M/s. Vinoth Builders has 2 projects on the TNRERA register since 2020, with no completion-date extensions on record. See the full record →

Frequently asked

Is VINOTH VENYA RERA registered?

Yes — registered with TNRERA as TN/29/Building/0449/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will VINOTH VENYA be completed?

The RERA-committed completion date is 31 Mar 2029. No deadline extensions are on record.

Who is the builder of VINOTH VENYA?

M/s. Vinoth Builders, with 2 projects on the TNRERA register and no completion-date extensions on record.

← All Chennai District projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.