VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/GST Road South/Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo

Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo

TN/29/Building/0375/2022PAST COMMITTED DATE

Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo is registered with TNRERA as TN/29/Building/0375/2022 (Building registration, 2022). The promoter is M/s. Sri Suprabhatham Builder, Rep. by its Proprietor, Thiru. R.Ravichandran. The RERA-committed completion date is 1 Sep 2024 — that date has now passed. Committed dates are legally binding under RERA.

28 Sep 2022
1 Sep 2024
10
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Project Name: ”Signature Ridge” - Construction of Registration of Stilt Floor + 5 Floors residential building with 10 dwelling units at Plot No.79B & 27 (part), New Door No.21, Old Door No.38, 1st Main Road, Nanganallur, Chennai – 600061 comprised in Survey Nos.19/3, 19/4 (part) & 20/4A (part), T.S.No.20/2 & 24, Block No.31, Ward No.B of Nanganallur Village, Alandur Taluk, Greater Chennai Corporation, Chennai.

Approval: The Member-Secretary, CMDA, Egmore, Chennai-8 issued Planning Permission No. PP/NRHB/169/2022 in Letter No. PP/NHRB/S(B1)/094/2022, dated 09.06.2022. The Greater Chennai Corporation issued Building Permission No. CEBA/WD

Status on register: Progress of Work as on September 2023

Builder track record: M/s. Sri Suprabhatham Builder, Rep. by its Proprietor, Thiru

M/s. Sri Suprabhatham Builder, Rep. by its Proprietor, Thiru. R.Ravichandran has 1 project on the TNRERA register since 2022, with no completion-date extensions on record.

Frequently asked

Is Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo RERA registered?

Yes — registered with TNRERA as TN/29/Building/0375/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo be completed?

The RERA-committed completion date is 1 Sep 2024. No deadline extensions are on record.

Who is the builder of Signature Ridge” - Construction of Registration of Stilt Floor + 5 Flo?

M/s. Sri Suprabhatham Builder, Rep. by its Proprietor, Thiru. R.Ravichandran.

← All GST Road South projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.