VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/Jway Lilly

Jway Lilly

TN/29/Building/0355/2023PAST COMMITTED DATE

Jway Lilly is registered with TNRERA as TN/29/Building/0355/2023 (Building registration, 2023). The promoter is M/s. Jway Constructions, Rep. by its Proprietor, Thiru. A.Yacoob Ali. The RERA-committed completion date is 31 Mar 2024 — that date has now passed. Committed dates are legally binding under RERA.

21 Aug 2023
31 Mar 2024
9
0

About this registration

Project Name: “Jway Lilly” - Construction of Registration of Developer’s share of Flats Nos.F2, F3, S2, S3, T2, T3 (Total 06 Flats) in Stilt Floor + 3 Floors Residential Building with 09 dwelling units at Door No.5, Plot No.5, 8th Street, Kuberan Nagar Extn., Madipakkam, Chennai comprised in S.No.132/74 of Madipakkam Village, Sholinganallur Taluk, Chennai District.

Approval: The Greater Chennai Corporation issued the Planning Permission in Letter No. PPA/WDCN14/05214/2022, dated 08.08.2022. The Greater Chennai Corporation issued the Building Permission in Letter RC.No. BA/WDCN14/05569/2022,

Builder track record: M/s. Jway Constructions, Rep. by its Proprietor, Thiru. A.Ya

M/s. Jway Constructions, Rep. by its Proprietor, Thiru. A.Yacoob Ali has 1 project on the TNRERA register since 2023, with no completion-date extensions on record.

Frequently asked

Is Jway Lilly RERA registered?

Yes — registered with TNRERA as TN/29/Building/0355/2023 in 2023. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Jway Lilly be completed?

The RERA-committed completion date is 31 Mar 2024. No deadline extensions are on record.

Who is the builder of Jway Lilly?

M/s. Jway Constructions, Rep. by its Proprietor, Thiru. A.Yacoob Ali.

← All OMR Corridor projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.