VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Central Chennai/Promenade

Promenade

TN/29/Building/033/2024REGISTERED

Promenade is registered with TNRERA as TN/29/Building/033/2024 (Building registration, 2024). The promoter is 1) M/s. Baashyaam Infrastructure Private Limited, Rep. by its Authorised Signatory, Thiru. Y.Abinesh. The RERA-committed completion date is 18 Sep 2030 (about 50 months away). Committed dates are legally binding under RERA.

6 Feb 2024
18 Sep 2030
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Project Name: “Promenade” - Construction of Registration of High Rise Building (HRB) consisting of Combined Extended Triple Basement Floor & Stilt Floor Part (Mechanical Parking) / Ground Floor Part (Shops & Creche) + 1st Floor (Partly Shop / Partly Parking) + 2nd Floor (Parking) + 3rd Floor to 10th Floor + 11th Floor to 13th Floor Part of Commercial (Office) Building with 57.30m height availing with Premium FSI at Old Door Nos.101, 102, 103/1 & 104, New Door Nos.70, 72, 73, 74, Anna Salai (Mount Road), Saidapet, Chennai – 600032 comprised in T.S.Nos.2/1, 2/2 & 2/3, Block No.7 of Adayar Village, Guindy Taluk within the limit of Greater Chennai Corporation.

Approval: CMDA issued Planning Permission No. OL-PP/HRB/0009/2023 in Letter No. CMDA/PP/HRB/S/0471/2022, dated 19.10.2023. The Executive Engineer (T.P), Greater Chennai Corporation issued Building Permission No. CEBA/WDCN13/00441/

Status on register: Progress of Work as on December 2025

Builder track record: 1) M/s. Baashyaam Infrastructure Private Limited, Rep. by it

1) M/s. Baashyaam Infrastructure Private Limited, Rep. by its Authorised Signatory, Thiru. Y.Abinesh has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.

Frequently asked

Is Promenade RERA registered?

Yes — registered with TNRERA as TN/29/Building/033/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Promenade be completed?

The RERA-committed completion date is 18 Sep 2030. No deadline extensions are on record.

Who is the builder of Promenade?

1) M/s. Baashyaam Infrastructure Private Limited, Rep. by its Authorised Signatory, Thiru. Y.Abinesh.

← All Central Chennai projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.