VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Ambattur–Avadi Belt/Construction of Block-1 & 3: Stilt Floor + 14 Floors

Construction of Block-1 & 3: Stilt Floor + 14 Floors

TN/29/Building/0286/2021REGISTERED

Construction of Block-1 & 3: Stilt Floor + 14 Floors is registered with TNRERA as TN/29/Building/0286/2021 (Building registration, 2021). The promoter is The Executive Engineer, who has 117 projects on the TNRERA register. The RERA-committed completion date is —. Committed dates are legally binding under RERA.

3 Sep 2021
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Construction of Block-1 & 3: Stilt Floor + 14 Floors with 280 Tenements in each Block and by totalling 560 Tenements. Block-2: Stilt Floor + 14 Floors with 280 Tenements (6 Tenements in refuge area in 7th & 12th Floor) and by totalling altogether 840 Tenements at NVN Nagar Main Road, Thirumangalam, Chennai comprised in S.Nos.211, 212 part, 215/1 part & 215/2 part, Block No.53 of Padi Village, Ambattur Taluk, Tiruvallur District and S.Nos.228/2 part & 228/3 part, Block No.24 & S.No.224/1A part, Block No.6 of Koyambedu Village, Aminjikarai Taluk, Chennai District.

Approval: Planning Permission issued by the Member Secretary / CMDA / Chennai vide Letter No. C3(S)/1128/2019, dated 23.03.2021. Building Permission issued by the Executive Engineer (T.P) / Greater Chennai Corporation / Chennai vi

Status on register: Completed

Builder track record: The Executive Engineer

The Executive Engineer has 117 projects on the TNRERA register since 2019, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Block-1 & 3: Stilt Floor + 14 Floors RERA registered?

Yes — registered with TNRERA as TN/29/Building/0286/2021 in 2021. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Block-1 & 3: Stilt Floor + 14 Floors be completed?

The RERA-committed completion date is —. No deadline extensions are on record.

Who is the builder of Construction of Block-1 & 3: Stilt Floor + 14 Floors?

The Executive Engineer, with 117 projects on the TNRERA register and no completion-date extensions on record.

← All Ambattur–Avadi Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.