VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Chennai District/Construction of Stilt Floor + 3 Floors of

Construction of Stilt Floor + 3 Floors of

TN/29/Building/0283/2020PAST COMMITTED DATE

Construction of Stilt Floor + 3 Floors of is registered with TNRERA as TN/29/Building/0283/2020 (Building registration, 2020). The promoter is M/s. Suvedaa Homes Pvt. Ltd.. The RERA-committed completion date is 10 May 2023 — that date has now passed. Committed dates are legally binding under RERA.

10 Aug 2020
10 May 2023
10
0

About this registration

Construction of Stilt Floor + 3 Floors of Residential Building with 10 dwelling units at Plot No.5, Morrison 5th Street, Alandur, Chennai – 600016, Comprised in Old S.No.16/3, T.S.No.145/6, Ward “A”, Block No.3 of Adambakkam Village, Alandur Taluk, Chennai District.

Approval: Planning Permission issued by the Executive Engineer (T.P), Greater Chennai Corporation, vide Letter No. PPA/WDCN12/07364/2019, dated 25.02.2020 and the Building Permission issued by the Executive Engineer (T.P.), Greate

Builder track record: M/s. Suvedaa Homes Pvt. Ltd.

M/s. Suvedaa Homes Pvt. Ltd. has 1 project on the TNRERA register since 2020, with no completion-date extensions on record.

Frequently asked

Is Construction of Stilt Floor + 3 Floors of RERA registered?

Yes — registered with TNRERA as TN/29/Building/0283/2020 in 2020. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Stilt Floor + 3 Floors of be completed?

The RERA-committed completion date is 10 May 2023. No deadline extensions are on record.

Who is the builder of Construction of Stilt Floor + 3 Floors of?

M/s. Suvedaa Homes Pvt. Ltd..

← All Chennai District projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.