AMARA AVIRA

TN/29/Building/0230/2025REGISTERED

AMARA AVIRA is registered with TNRERA as TN/29/Building/0230/2025 (Building registration, 2025). The promoter is , who has 552 projects on the TNRERA register. The RERA-committed completion date is 31 Dec 2028 (about 29 months away). Committed dates are legally binding under RERA.

28 Jun 2025
31 Dec 2028
14
0

From the detailed register filing

Under Construction
High Rise Building(HRB)
1484

Planning permission issued by CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY (No. CMDA/PP/HRB/S/0899/2024 & OL-PP/HRB/0025/2025) on 2 Jun 2025, valid until 1 Jun 2033.

About this registration

Promoter entity: Company. From the filed incorporation/firm certificate.

Project Name: AMARA AVIRA Registration for High-Rise Residential Building consisting of an Extended Basement Floor + Stilt Floor (Part)/Ground Floor (Part) + 14 Floors Residential Building of height 48.00m with 14 Dwelling Units & an Open Swimming Pool @ Terrace Floor Level at old Door No.52 & 53, New Door No.04 & 06, abutting Vijaya Raghavachari Road and Dr.B Narasimhan Road (North Boag Road), T.Nagar,Chennai – 600017, Comprised originally in old S.No. 58/2, then T.S.No.4887/2(part), currently in T.S.No. 4887/4 & T.S.No.4887/6, Block No.114, T.Nagar Village, Guindy Taluk within the limits of Greater Chennai Corporation, Chennai District.

Approval: The CMDA issued planning permission No.OL-PP/HRB/0025/2025 in Letter No.CMDA/PP/HRB/S/0899/2024 dated 02/06/2025. The Greater Chennai Corporation issued building permission in Letter No.CEBA/WDCN09/00237/2025 dated 11/06

Builder track record:

has 552 projects on the TNRERA register since 2017, with no completion-date extensions on record. See the full record →

Frequently asked

Is AMARA AVIRA RERA registered?

Yes — registered with TNRERA as TN/29/Building/0230/2025 in 2025. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will AMARA AVIRA be completed?

The RERA-committed completion date is 31 Dec 2028. No deadline extensions are on record.

Who is the builder of AMARA AVIRA?

, with 552 projects on the TNRERA register and no completion-date extensions on record.

← All Central Chennai projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.