VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Central Chennai/Construction of Stilt Floor + 5 Floors

Construction of Stilt Floor + 5 Floors

TN/29/Building/0221/2022PAST COMMITTED DATE

Construction of Stilt Floor + 5 Floors is registered with TNRERA as TN/29/Building/0221/2022 (Building registration, 2022). The promoter is 1) Thiru. C.C.Senthil Kumar, who has 5 projects on the TNRERA register. The RERA-committed completion date is 31 Mar 2024 — that date has now passed. Committed dates are legally binding under RERA.

21 Jun 2022
31 Mar 2024
15
0

Latest quarterly progress filing — 31st DECEMBER 2023

Stage, as filed: Block/Tower,Floor wise

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
3BHK818–8603

67% of units have a balcony on the filed area statement, typically around 28 sq.ft.

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of Stilt Floor + 5 Floors with 15 dwelling units at New Door No.29, Old Door No.56A-D, R.K.Shanmugam Salai, K.K.Nagar, Chennai comprised in Old S.No.394/1Apt, T.S.No.39, Block No.99 of Kodambakkam Village, Mambalam Taluk, Chennai District.

Approval: Planning Permission issued by The Senior Planner / Area Plans Unit / CMDA / Chennai vide Letter No. PP/NHRB/C/549/2021, dated 30.12.2021. Building Permission issued by The Executive Engineer (T.P.) / Greater Chennai Corp

Status on register: Progress of Work as on June 2024

Builder track record: 1) Thiru. C.C.Senthil Kumar

1) Thiru. C.C.Senthil Kumar has 5 projects on the TNRERA register since 2020, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Stilt Floor + 5 Floors RERA registered?

Yes — registered with TNRERA as TN/29/Building/0221/2022 in 2022. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Stilt Floor + 5 Floors be completed?

The RERA-committed completion date is 31 Mar 2024. No deadline extensions are on record.

Who is the builder of Construction of Stilt Floor + 5 Floors?

1) Thiru. C.C.Senthil Kumar, with 5 projects on the TNRERA register and no completion-date extensions on record.

← All Central Chennai projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →