VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Ambattur–Avadi Belt/V R RESIDENCES

V R RESIDENCES

TN/29/Building/0093/2025REGISTERED

V R RESIDENCES is registered with TNRERA as TN/29/Building/0093/2025 (Building registration, 2025). The promoter is M/s. PUSHKAR PROPERTIES PRIVATE LIMITED rep by its Director Thiru. P.Kruthivas. The RERA-committed completion date is 31 Aug 2026 (about 1 months away). Committed dates are legally binding under RERA.

25 Mar 2025
31 Aug 2026
9
0

From the detailed register filing

Under Construction
Non-High Rise Building(NHRB)
680

Planning permission issued by CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY (No. CMDA/PP/NHRB/C/0211/2024) on 6 Dec 2024, valid until 5 Dec 2032.

About this registration

Promoter entity: Company. From the filed incorporation/firm certificate.

Project Name: V R RESIDENCES Registration for Promoter's Share of Flat Nos. 1A, 2A, 2B, 3A (Totally 4 Flats) Stilt Floor + 5 Floors (Height 18.30 m) Residential Building with 9 dwelling units availing Premium FSI with TOD Benefit at NewDoor No. 25, Old Door No. 14, H-Block, 15th Main Road & 11th Main Road, Anna Nagar West, Chennai – 600040, comprised in Old S.No. 207/1A1A Part, T.S. No:10, Block No. 14 of Koyambedu Village, Chennai District.

Approval: CMDA issued Planning Permission in OL-PP/NHRB/0711/2024 in Letter No. CMDA/PP/NHRB/C/0211/2024, dated 06/12/2024. The Executive Engineer (T.P), Greater Chennai Corporation has issued Building Permission in Letter No. CEB

Builder track record: M/s. PUSHKAR PROPERTIES PRIVATE LIMITED rep by its Director

M/s. PUSHKAR PROPERTIES PRIVATE LIMITED rep by its Director Thiru. P.Kruthivas has 1 project on the TNRERA register since 2025, with no completion-date extensions on record.

Frequently asked

Is V R RESIDENCES RERA registered?

Yes — registered with TNRERA as TN/29/Building/0093/2025 in 2025. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will V R RESIDENCES be completed?

The RERA-committed completion date is 31 Aug 2026. No deadline extensions are on record.

Who is the builder of V R RESIDENCES?

M/s. PUSHKAR PROPERTIES PRIVATE LIMITED rep by its Director Thiru. P.Kruthivas.

← All Ambattur–Avadi Belt projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.