VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/Purva Windermere Phase-4C

Purva Windermere Phase-4C

TN/29/Building/0010/2023REGISTERED

Purva Windermere Phase-4C is registered with TNRERA as TN/29/Building/0010/2023 (Building registration, 2023). The promoter is M/s. PURAVANKARA LIMITED, who has 6 projects on the TNRERA register. The RERA-committed completion date is 31 Dec 2029 (about 41 months away). Committed dates are legally binding under RERA.

4 Jan 2023
31 Dec 2029
144
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Project Name: “Purva Windermere Phase-4C” - Construction of Registration of Phase-4C consisting of 6 Blocks of Block–M6: Stilt Floor + 12 Floors Residential Building with 96 dwelling units, Block–M7: Stilt Floor + 12 Floors Residential Building with 96 dwelling units, Block–P1: Stilt Floor + 12 Floors Residential Building with 144 dwelling units, Block–P2: Stilt Floor + 12 Floors Residential Building with 142 dwelling units, Block–Club House: Ground Floor + First Floor with Swimming Pool, Block–Commercial: Ground Floor + 1st Floor Building and Block-MLCP2: Stilt Floor + 2 Floors + Terrace Level for Parking (Total 7 Blocks) comprised in S.Nos.1/1B1, 1/1B2, 1/2, 2/1, 2/2, 2/3, 2/4, 2/5, 3/1, 3

Approval: The CMDA issued Planning Permission No. C/PP/HRB/43/S-01 to S-34/2022 in Letter No. C3(S)/024/2020, dated 21.10.2022. Greater Chennai Corporation issued Building Permission No. CEBA/WDCN14/00355/2022, dated 18/11/2022. T

Status on register: Progress of Work as on March 2025

Builder track record: M/s. PURAVANKARA LIMITED

M/s. PURAVANKARA LIMITED has 6 projects on the TNRERA register since 2019, with no completion-date extensions on record. See the full record →

Frequently asked

Is Purva Windermere Phase-4C RERA registered?

Yes — registered with TNRERA as TN/29/Building/0010/2023 in 2023. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Purva Windermere Phase-4C be completed?

The RERA-committed completion date is 31 Dec 2029. No deadline extensions are on record.

Who is the builder of Purva Windermere Phase-4C?

M/s. PURAVANKARA LIMITED, with 6 projects on the TNRERA register and no completion-date extensions on record.

← All OMR Corridor projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.