Purva Windermere Phase-4B is registered with TNRERA as TN/29/Building/0009/2023 (Building registration, 2023). The promoter is M/s. PURAVANKARA LIMITED, who has 6 projects on the TNRERA register. The RERA-committed completion date is 31 Dec 2028 (about 29 months away). Committed dates are legally binding under RERA.

4 Jan 2023
31 Dec 2028
288
0

A quarterly progress filing exists for this project on the TNRERA register as a scanned document; we haven't machine-read it yet.

About this registration

Project Name: “Purva Windermere Phase-4B” - Construction of Registration of Phase-4B consisting of 5 Blocks of Block–M4: Stilt Floor + 12 Floors Residential Building with 96 dwelling units, Block–M5: Stilt Floor + 12 Floors Residential Building with 96 dwelling units, Block–L: Stilt Floor + 12 Floors Residential Building with 288 dwelling units, Block–P3: Stilt Floor + 11 Floors Residential Building with 132 dwelling units, Block–EWS16: Stilt Floor + 7 Floors Residential Building with 56 dwelling units comprised in S.Nos.1/1B1, 1/1B2, 1/2, 2/1, 2/2, 2/3, 2/4, 2/5, 3/1, 3/2A, 3/2B1, 3/2B2, 3/2C, 4/1A, 4/1B, 4/1C, 4/2A1, 4/2A2, 4/2B1, 4/2B2, 4/3A, 4/3B, 4/3C, 4/3D, 4/3E, 4/3F, 4/4, 6/1A, 6/1B,

Approval: The CMDA issued Planning Permission No. C/PP/HRB/43/S-01 to S-34/2022 in Letter No. C3(S)/024/2020, dated 21.10.2022. Greater Chennai Corporation issued Building Permission No. CEBA/WDCN14/00355/2022, dated 18/11/2022. T

Status on register: Progress of Work as on March 2025

Builder track record: M/s. PURAVANKARA LIMITED

M/s. PURAVANKARA LIMITED has 6 projects on the TNRERA register since 2019, with no completion-date extensions on record. See the full record →

Frequently asked

Is Purva Windermere Phase-4B RERA registered?

Yes — registered with TNRERA as TN/29/Building/0009/2023 in 2023. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Purva Windermere Phase-4B be completed?

The RERA-committed completion date is 31 Dec 2028. No deadline extensions are on record.

Who is the builder of Purva Windermere Phase-4B?

M/s. PURAVANKARA LIMITED, with 6 projects on the TNRERA register and no completion-date extensions on record.

← All OMR Corridor projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.