VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Tiruchirappalli District/ARJITH ALLURE

ARJITH ALLURE

TN/16/Building/0303/2024REGISTERED

ARJITH ALLURE is registered with TNRERA as TN/16/Building/0303/2024 (Building registration, 2024). The promoter is 1. Thiru.V.Gouthaman and 2.M/s. Arjith Allure. The RERA-committed completion date is 13 Nov 2031 (about 63 months away). Committed dates are legally binding under RERA.

29 Feb 2024
13 Nov 2031
35
0

From the detailed register filing

Under Construction
Non-High Rise Building(NHRB)
1254.19

Planning permission issued by Joint Director / Deputy Director / Assistant Director / DTCP / Tiruchirappalli / (No. SWP/BPA/022966/2023) on 14 Nov 2023, valid until 13 Nov 2031.

About this registration

Project Name: ARJITH ALLURE Stilt Floor + 5 Floors residential building with 35 dwelling units at Door No.13 , Arokiyasamy Pillai Street comprised in New T.S.No. 5 (S.F.No. 136/1A Part), Ward - AK, Block No.8 of K.Abishekapuram Village, Crawford, Zone IV, Tiruchirappalli City Corporation, Tiruchirappalli West Taluk, Tiruchirappalli District.

Approval: The Joint Director / DTCP / Tiruchirappalli District has issued the planning permission in Letter No. SWP/BPA/022966/2023 dated 14.11.2023. The Assistant Commissioner / Tiruchirappalli City Municipal Corporation has issu

Builder track record: 1. Thiru.V.Gouthaman and 2.M/s. Arjith Allure

1. Thiru.V.Gouthaman and 2.M/s. Arjith Allure has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.

Frequently asked

Is ARJITH ALLURE RERA registered?

Yes — registered with TNRERA as TN/16/Building/0303/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will ARJITH ALLURE be completed?

The RERA-committed completion date is 13 Nov 2031. No deadline extensions are on record.

Who is the builder of ARJITH ALLURE?

1. Thiru.V.Gouthaman and 2.M/s. Arjith Allure.

← All Tiruchirappalli District projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.