VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Coimbatore District/Registration for Stilt Floor + 5 Floors

Registration for Stilt Floor + 5 Floors

TN/11/Building/0602/2024PAST COMMITTED DATE

Registration for Stilt Floor + 5 Floors is registered with TNRERA as TN/11/Building/0602/2024 (Building registration, 2024). The promoter is Kamal Siyal. The RERA-committed completion date is 1 Aug 2026 — that date has now passed. Committed dates are legally binding under RERA.

23 Dec 2024
1 Aug 2026
15
0

From the detailed register filing

Under Construction
Non-High Rise Building(NHRB)
1206.98

Planning permission issued by Joint Director Coimbatore District (No. SWP/BPA/181367/2024) on 6 Jun 2024, valid until 5 Jun 2032.

About this registration

Registration for Stilt Floor + 5 Floors Residential Building with 15 dwelling units Comprised in T.S.No.123/1, 123/2, 123/3, Ward No. H(8) - Block No.3, Cowley Brown Road, R.S. Puram, Coimbatore Village, Coimbatore Corporation, Coimbatore District.

Approval: The Joint Director, T&CP, Coimbatore District issued Planning permission No. SWP/ BPA/181367/2024 dated 06/06/2024. The Commissioner, Coimbatore city Municipal Corporation issued Building License No.162/BL/2024/03/071/02

Builder track record: Kamal Siyal

Kamal Siyal has 1 project on the TNRERA register since 2024, with no completion-date extensions on record.

Frequently asked

Is Registration for Stilt Floor + 5 Floors RERA registered?

Yes — registered with TNRERA as TN/11/Building/0602/2024 in 2024. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Registration for Stilt Floor + 5 Floors be completed?

The RERA-committed completion date is 1 Aug 2026. No deadline extensions are on record.

Who is the builder of Registration for Stilt Floor + 5 Floors?

Kamal Siyal.

← All Coimbatore District projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.