VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Erode District/Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2

Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2

TN/10/Building/0068/2020COMPLETED

Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2 is registered with TNRERA as TN/10/Building/0068/2020 (Building registration, 2020). The promoter is The Executive Engineer, who has 117 projects on the TNRERA register. The RERA-committed completion date is 3 Apr 2021 — that date has now passed. Committed dates are legally binding under RERA.

19 Feb 2020
3 Apr 2021
360
0

About this registration

Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2 with 16 dwelling units in each floor. Each block of Ground Floor + 2 Floors of Block B1, B2, B3, B4 with 36 dwelling units in each floor. Each block of Ground Floor + 2 Floors of C1, C2, C3, C4, C5 with 24 dwelling units in each floor totalling 360 dwelling units Comprised in S.No.358/1 of Panayampalli Village & Panchayat, Sathyamangalam Taluk, Bhavanisagar Panchayat Union, Erode District.

Approval: The Assistant Director (T&CP), Tiruppur Region has accorded Technical Sanction Vide Letter No.3764/2019/TR-2, dated 29.01.2020. Building Permission issued by the Special Officer/ Panayampalli Village Panchayat Union Vide

Status on register: Completed

Builder track record: The Executive Engineer

The Executive Engineer has 117 projects on the TNRERA register since 2019, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2 RERA registered?

Yes — registered with TNRERA as TN/10/Building/0068/2020 in 2020. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2 be completed?

The RERA-committed completion date is 3 Apr 2021. No deadline extensions are on record.

Who is the builder of Construction of Each Block of Ground Floor + 2 Floors of Block A1 & A2?

The Executive Engineer, with 117 projects on the TNRERA register and no completion-date extensions on record.

← All Erode District projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.