VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Ambattur–Avadi Belt/Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors

Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors

TN/02/Building/0254/2018PAST COMMITTED DATE

Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors is registered with TNRERA as TN/02/Building/0254/2018 (Building registration, 2018). The promoter is M/s. Adithi Deep Housing Pvt. Ltd., (previously M/s. Adithi Housing Development Pvt. Ltd.,). The RERA-committed completion date is 31 Jul 2019 — that date has now passed. Committed dates are legally binding under RERA.

1 Aug 2018
31 Jul 2019
186
0

Latest quarterly progress filing

100%

Stage, as filed: Block/Tower, Floor wise (Completion Certificate obtained)

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
2BHK415–59142

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors with 94 dwelling units and Block – 2 – Stilt floor + 4 Floors with 92 dwelling units (Total 186 dwelling units at S.Nos.78/2B and 79 of Adayalampattu Village, Ambattur Taluk, Tiruvallur District.

Approval: Approved by CMDA Planning Permission No. B/Spl.Bldg./249 A to G/2013 in letter No.B3/18005/2012 dated 19/07/2013, the President, Adayalampattu Panchayat Building Permission No.10/2013 dated 05.09.2013 and Renewal of Plan

Status on register: Progress of Work as on December 2022

Builder track record: M/s. Adithi Deep Housing Pvt. Ltd., (previously M/s. Adithi

M/s. Adithi Deep Housing Pvt. Ltd., (previously M/s. Adithi Housing Development Pvt. Ltd.,) has 1 project on the TNRERA register since 2018, with no completion-date extensions on record.

Frequently asked

Is Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors RERA registered?

Yes — registered with TNRERA as TN/02/Building/0254/2018 in 2018. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors be completed?

The RERA-committed completion date is 31 Jul 2019. No deadline extensions are on record.

Who is the builder of Construction of 2 Blocks of Block 1 – Stilt floor + 4 floors?

M/s. Adithi Deep Housing Pvt. Ltd., (previously M/s. Adithi Housing Development Pvt. Ltd.,).

← All Ambattur–Avadi Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.