VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Ambattur–Avadi Belt/Vijay Raja 360º

Vijay Raja 360º

TN/02/Building/0036/2021PAST COMMITTED DATE

Vijay Raja 360º is registered with TNRERA as TN/02/Building/0036/2021 (Building registration, 2021). The promoter is M/s. Vijay Raja Homes Pvt. Ltd., Vijayaraja’s Apex. The RERA-committed completion date is 27 Sep 2025 — that date has now passed. Committed dates are legally binding under RERA.

5 Feb 2021
27 Sep 2025
2,736
0

Latest quarterly progress filing

95%

Stage, as filed: Block/Tower, floor-wise 2 Stage of construction of each Block C Under Progress Block/Tower, floor-wise Sl.No. Description Percentage

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

About this registration

Project Name: “Vijay Raja 360º” - Construction of High Rise Residential & Commercial Group Development viz. Block-A: Stilt Floor + 19 Floors – Residential building with 950 dwelling units & Open Swimming Pool in Stilt Floor, Block-B: Stilt Floor + 19 Floors – Residential building with 627 dwelling units, Block-C: Stilt Floor + 19 Floors – Residential building with 437 dwelling units, Block-D: Stilt Floor + 19 Floors – Residential building with 722 dwelling units, Totally 2736 dwelling units, Block-E (Multipex): Stilt Floor + 1st Floor to 4th Floor – Multiplex Complex with Shops & Cinema Theatre comprised in S.Nos.64/1A1, 2A, 2B, 7C, 8A1, 8A2, 8B &72/1B of Korattur Village, Poonamallee, Thiru

Approval: CMDA issued Planning Permission in Letter No. C3(N)/21575/2018, dated 11.11.2020. The Commissioner, Poonamallee Panchayat Union forward to the President, Korattur Panchayat to issued Building Permission in Letter RC No.

Status on register: Progress of Work as on December 2025

Builder track record: M/s. Vijay Raja Homes Pvt. Ltd., Vijayaraja’s Apex

M/s. Vijay Raja Homes Pvt. Ltd., Vijayaraja’s Apex has 1 project on the TNRERA register since 2021, with no completion-date extensions on record.

Frequently asked

Is Vijay Raja 360º RERA registered?

Yes — registered with TNRERA as TN/02/Building/0036/2021 in 2021. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Vijay Raja 360º be completed?

The RERA-committed completion date is 27 Sep 2025. No deadline extensions are on record.

Who is the builder of Vijay Raja 360º?

M/s. Vijay Raja Homes Pvt. Ltd., Vijayaraja’s Apex.

← All Ambattur–Avadi Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.