VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/GST Road South/Construction of Block No.1, Double Basement Floor + Stilt floor + 1…

Construction of Block No.1, Double Basement Floor + Stilt floor + 1…

TN/01/Building/0090/2018REGISTERED

Construction of Block No.1, Double Basement Floor + Stilt floor + 1… is registered with TNRERA as TN/01/Building/0090/2018 (Building registration, 2018). The promoter is Thiru. R.DAMODARAN, who has 3 projects on the TNRERA register. The RERA-committed completion date is —. Committed dates are legally binding under RERA.

16 Mar 2018
290
0

Latest progress filing

The project's most recent quarterly filing on the TNRERA register references completion certificate — a completion-stage document. Ask the builder for the certificate and current possession status.

From the quarterly progress filing

The builder's filing references a completion certificate — a sign of completion. Confirm the certificate directly with the builder or on the TNRERA portal.

Read from a scanned quarterly filing via OCR. Verify against the source before relying on it.

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
3BHK5391

Machine-read from the filed carpet-area statement (low OCR confidence — verify against source). Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of Block No.1, Double Basement Floor + Stilt floor + 17 floors with 290 dwelling units comprised in S.Nos. 311/3B, 3C1, 3C2, 3C3A, 3C3B, 3C3C, 312/17B, 18A1A, 18A1B, 18A1C, 18A1D, 312/18A1E, 181F, 181G, 181H, 18B1, 18B2 of Kottivakkam Village, Nehru Nagar, Kottivakkam, Tambaram Taluk, Kancheepuram District.

Approval: Approved by CMDA vide PP B/Spl.Bldg./MSB IT/64 A to R/2013 in letter No.C3(N)/10826/2011 dated 3.12.2013, Building Permission issued by Corporation of Chennai vide CEBA/WDCN14/00113/2015 dated 20.05.2015

Status on register: Project under IBC proceedings before Hon'ble NCLT, Chennai - Progress of Work as on December 2020

Planning permission for this project was issued by CMDA (read from the approval document on the TNRERA register).

Builder track record: Thiru. R.DAMODARAN

Thiru. R.DAMODARAN has 3 projects on the TNRERA register since 2018, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Block No.1, Double Basement Floor + Stilt floor + 1… RERA registered?

Yes — registered with TNRERA as TN/01/Building/0090/2018 in 2018. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Block No.1, Double Basement Floor + Stilt floor + 1… be completed?

The RERA-committed completion date is —. No deadline extensions are on record.

Who is the builder of Construction of Block No.1, Double Basement Floor + Stilt floor + 1…?

Thiru. R.DAMODARAN, with 3 projects on the TNRERA register and no completion-date extensions on record.

← All GST Road South projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.