Lions Gate

TN/01/Building/0070/2023REGISTERED

Lions Gate is registered with TNRERA as TN/01/Building/0070/2023 (Building registration, 2023). The promoter is M/s. Russel Foundations (P) Ltd., Rep. by its Managing Director, Thiru. K.Russelian. The RERA-committed completion date is 24 Aug 2026 (about 1 months away). Committed dates are legally binding under RERA.

8 Feb 2023
24 Aug 2026
131
0

Latest quarterly progress filing — March 2025

70%
60%

Source: the project's Quarterly Progress Report filed with TNRERA (as on the quarter shown; may not reflect current status).

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
2BHK8421

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Project Name: “Lions Gate” - Construction of Registration of Group Development comprising of 4 Blocks, Block-A: Stilt Floor + 3 Floors + 4th Floor Part + 5th Floor Residential Building with 21 dwelling units and covered Swimming Pool at 1st Floor Level, Block-B: Stilt Floor + 5 Floors Residential building with 40 dwelling units, Block-C: Stilt Floor + 4 Floors + 5th Floor Residential building with 38 dwelling units, Block-D: Stilt Floor + 4 Floors Residential building with 32 dwelling units totally 131 dwelling units availing with Premium FSI at Madambakkam, Chennai comprised in Survey Nos.716/1D1, 1D2, 3, 4 & 5 of Madambakkam Village within the limit of Madambakkam Town Panchayat, Chengalpe

Approval: CMDA issued Planning Permission No. B/NHRB/251 A to H/2021 in Letter No. PP/NHRB/S(B1)/1070/2019, dated 25.08.2021. The Commissioner, Tambaram Corporation, Madambakkam issued Building Permission No. 01/2022, dated 28.01.

Status on register: Progress of Work as on March 2025

Planning permission for this project was issued by CMDA (read from the approval document on the TNRERA register).

Builder track record: M/s. Russel Foundations (P) Ltd., Rep. by its Managing Direc

M/s. Russel Foundations (P) Ltd., Rep. by its Managing Director, Thiru. K.Russelian has 1 project on the TNRERA register since 2023, with no completion-date extensions on record.

Frequently asked

Is Lions Gate RERA registered?

Yes — registered with TNRERA as TN/01/Building/0070/2023 in 2023. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Lions Gate be completed?

The RERA-committed completion date is 24 Aug 2026. No deadline extensions are on record.

Who is the builder of Lions Gate?

M/s. Russel Foundations (P) Ltd., Rep. by its Managing Director, Thiru. K.Russelian.

← All Chengalpattu District projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.