VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/OMR Corridor/Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors

Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors

TN/01/Building/0066/2018COMPLETED

Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors is registered with TNRERA as TN/01/Building/0066/2018 (Building registration, 2018). The promoter is M/s. K.G.Foundations (P) Ltd., Ground Floor, who has 2 projects on the TNRERA register. The RERA-committed completion date is 5 Aug 2021 — that date has now passed. Committed dates are legally binding under RERA.

22 Feb 2018
5 Aug 2021
32
0

Latest progress filing

The project's most recent quarterly filing on the TNRERA register references completion certificate — a completion-stage document. Ask the builder for the certificate and current possession status.

From the quarterly progress filing

The builder's filing references a completion certificate — a sign of completion. Confirm the certificate directly with the builder or on the TNRERA portal.

Read from a scanned quarterly filing via OCR. Verify against the source before relying on it.

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

Carpet areas range from 667 to 923 sq.ft (median 780 sq.ft) across 188 units.

27% of units have a balcony on the filed area statement, typically around 33 sq.ft.

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors with 32 dwelling units each, Block B1-Stilt floor + 4 floors with 32 dwelling units, Block B2-Stilt floor + 4 floors (Residential + commercial) with 28 dwelling units comprised in S.No.225/2B of Siruseri Village, Chengalpattu, Kancheepuram District.

Approval: Approved by Commissioner, Town & Country Planning, Chennai vide Lr.No.9150/2012/CP dt.01.03.2013 approved by Member Secretary (i/c), Mamallapuram Local Planning Authority, Chengalpattu vide Lr.No.996/2011, MLPA dt.06.08.

Status on register: Completed

Builder track record: M/s. K.G.Foundations (P) Ltd., Ground Floor

M/s. K.G.Foundations (P) Ltd., Ground Floor has 2 projects on the TNRERA register since 2018, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors RERA registered?

Yes — registered with TNRERA as TN/01/Building/0066/2018 in 2018. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors be completed?

The RERA-committed completion date is 5 Aug 2021. No deadline extensions are on record.

Who is the builder of Construction of Block A1, A2, A3, A9- Stilt floor + 4 floors?

M/s. K.G.Foundations (P) Ltd., Ground Floor, with 2 projects on the TNRERA register and no completion-date extensions on record.

← All OMR Corridor projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.