Construction of Basement Floor part+ Ground Floor part+ Stilt Floor…

TN/01/Building/0017/2017COMPLETED

Construction of Basement Floor part+ Ground Floor part+ Stilt Floor… is registered with TNRERA as TN/01/Building/0017/2017 (Building registration, 2017). The promoter is M/s. Casa Grand Builder Pvt. Ltd., NPL Devi, who has 8 projects on the TNRERA register. The RERA-committed completion date is 31 Jan 2019 — that date has now passed. Committed dates are legally binding under RERA.

21 Aug 2017
31 Jan 2019
0

Latest progress filing

The project's most recent quarterly filing on the TNRERA register references handed over — a completion-stage document. Ask the builder for the certificate and current possession status.

From the quarterly progress filing

The builder's filing references a handed over — a sign of completion. Confirm the certificate directly with the builder or on the TNRERA portal.

Read from a scanned quarterly filing via OCR. Verify against the source before relying on it.

Apartment sizes (carpet area)

RERA carpet areas for this project, read from the filed area statement — the real usable floor area, excluding balcony and common space.

ConfigurationCarpet area (sq.ft)Units
4BHK1,603–1,62912
3BHK1,063–1,262114
2BHK191–834140

Machine-read from the filed carpet-area statement. Normalised to sq.ft from sq.m. View the original document filed with TNRERA ↗

About this registration

Construction of Basement Floor part+ Ground Floor part+ Stilt Floor part+ 4 Floors of Residential Dwelling Units of 295 Nos (60 Nos LIG Units) with Swimming Pool in S.No.235/2B3, 235/3A2, 5B, 6B & 8D (as per Patta) S.Nos.235/2B1 part, 5B, 6, 8 & 3A (as per Document) of Manapakkam Village, Sriperumbudur Taluk, Kancheepuram District.

Approval: Approved by CMDA vide Planning Permit B/SplBldg/176A to H/2016 dated 19.08.2016, Building License from Corporation vide CEBA/WDCN12/00218/2016 dated 19.09.2016

Status on register: Completed

Planning permission for this project was issued by CMDA (read from the approval document on the TNRERA register).

Builder track record: M/s. Casa Grand Builder Pvt. Ltd., NPL Devi

M/s. Casa Grand Builder Pvt. Ltd., NPL Devi has 8 projects on the TNRERA register since 2017, with no completion-date extensions on record. See the full record →

Frequently asked

Is Construction of Basement Floor part+ Ground Floor part+ Stilt Floor… RERA registered?

Yes — registered with TNRERA as TN/01/Building/0017/2017 in 2017. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will Construction of Basement Floor part+ Ground Floor part+ Stilt Floor… be completed?

The RERA-committed completion date is 31 Jan 2019. No deadline extensions are on record.

Who is the builder of Construction of Basement Floor part+ Ground Floor part+ Stilt Floor…?

M/s. Casa Grand Builder Pvt. Ltd., NPL Devi, with 8 projects on the TNRERA register and no completion-date extensions on record.

← All Porur Belt projects and market data

Source documents on TNRERA

These are the government's own filed documents for this project. We link them directly — verify anything on this page against them.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.