VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/GST Road South/LIONS GATE

LIONS GATE

RA/35/BLG/0127/2026REGISTERED

LIONS GATE is registered with TNRERA as RA/35/BLG/0127/2026 (Building registration, 2026). The promoter is M/s. Russel Foundations Private Limited (Promoter). The RERA-committed completion date is 2 Dec 2026 (about 4 months away). Committed dates are legally binding under RERA.

10 Apr 2026
2 Dec 2026
122
0

About this registration

Project Name: LIONS GATE Revised Registration for Group Housing Development with 4 Blocks ; Block A – Stilt Floor + 3 Floors + 4th Floor (part) + 5th Floor (part) Residential building with 19 dwelling units and Association Room , Yoga Room , Kids Play Room , Library , GYM and Swimming pool at 5th Floor level ; Block B – Stilt Floor + 5 Floors Residential building with 33 dwelling units ; Block C – Stilt Floor + 4 Floors + 5th Floor (part) Residential building with 38 dwelling units ; Block D – Stilt Floor + 4 Floors Residential building with 32 dwelling units ; Totally 122 dwelling unit at Madambakkam , Chennai. Comprised in S.Nos. 716/1D1 , 716/1D2 , 716/3 , 716/4 , 716/5 of Madambakkam Vil

Approval: The Assistant Director , CMDA , Chennai has issued revised planning permission vide letter No. CMDA/PP/NHRB/S/0436/2025 dated 11.11.2025. The Commissioner , Tambaram City Municipal Corporation has issued revised building

Builder track record: M/s. Russel Foundations Private Limited (Promoter)

M/s. Russel Foundations Private Limited (Promoter) has 1 project on the TNRERA register since 2026, with no completion-date extensions on record.

Frequently asked

Is LIONS GATE RERA registered?

Yes — registered with TNRERA as RA/35/BLG/0127/2026 in 2026. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will LIONS GATE be completed?

The RERA-committed completion date is 2 Dec 2026. No deadline extensions are on record.

Who is the builder of LIONS GATE?

M/s. Russel Foundations Private Limited (Promoter).

← All GST Road South projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.