VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Localities/Coimbatore District/WELLINGTON VILLAGE

WELLINGTON VILLAGE

RA/11/BLG/0308/2025REGISTERED

WELLINGTON VILLAGE is registered with TNRERA as RA/11/BLG/0308/2025 (Building registration, 2025). The promoter is M/s. PARS ENGINEERING INDIA PRIVATE LIMITED. The RERA-committed completion date is 30 Dec 2030 (about 53 months away). Committed dates are legally binding under RERA.

17 Sep 2025
30 Dec 2030
47
0

About this registration

Project Name: WELLINGTON VILLAGE Registration for Group Development of Residential Villas consisting of 15 Blocks with Block - 1 (Villa - 01) Ground Floor + 2 Floors with 1 Dwelling Unit, Block - 2 (Villa - 02) Ground Floor + 2 Floors with 1 Dwelling Unit, Block - 3 (Villa - 03) Ground Floor + 2 Floors with 1 Dwelling Units, Block - 4 (Villa - 04, 05, 06, 07, 08, 09, 10) Ground Floor + 2 Floors with 7 Dwelling Units, Block - 5 (Typical Villa - 11, 12, 13) Ground Floor + 2 Floors with 3 Dwelling Units, Block - 6 (Typical Villa - 14, 15, 16, 17, 18) Ground Floor + 2 Floors with 5 Dwelling Units, Block - 7 (Typical Villa - 19, 20, 21) Ground Floor + 2 Floors with 3 Dwelling Units, Block - 8 (Ty

Approval: The Joint Director, T&CP, Coimbatore District has issued Planning Permission in Letter ROC No. SWP/BPA/0351438/2024, dated 28/01/2025. The Commissioner, Coimbatore City Municipal Corporation has issued Building Permissio

Builder track record: M/s. PARS ENGINEERING INDIA PRIVATE LIMITED

M/s. PARS ENGINEERING INDIA PRIVATE LIMITED has 1 project on the TNRERA register since 2025, with no completion-date extensions on record.

Frequently asked

Is WELLINGTON VILLAGE RERA registered?

Yes — registered with TNRERA as RA/11/BLG/0308/2025 in 2025. Always quote this number when dealing with the builder; unregistered projects cannot legally be marketed or sold in Tamil Nadu.

When will WELLINGTON VILLAGE be completed?

The RERA-committed completion date is 30 Dec 2030. No deadline extensions are on record.

Who is the builder of WELLINGTON VILLAGE?

M/s. PARS ENGINEERING INDIA PRIVATE LIMITED.

← All Coimbatore District projects and market data

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this project featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.