VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Builders/M/s. G.P. HOMES (P) LTD.

M/s. G.P. HOMES (P) LTD.

M/s. G.P. HOMES (P) LTD. has 8 projects on the TNRERA register since 2019 — 93 units/plots in total, concentrated in Poonamallee Corridor, Ambattur–Avadi Belt, North Chennai. 0 completion-deadline extensions are recorded across their projects, and 5 projects are past their committed completion dates on the register. All figures from TNRERA public records.

8
2019
93
0

Company & registration

The registered promoter entity on file is SA HOMES INFRASTRUCTURE PRIVATE LIMITED, incorporated in 2024. Corporate Identity Number U68200TN2024PTC171933.

Read from the promoter's incorporation / firm-registration certificate filed with TNRERA.

Builder Performance Dashboard

Computed from TNRERA register entries only — every metric's method is stated below it. Register status can lag reality; treat as one research input.

50%
0%
2
20 mo
100%
2.8 mo

Marked completed: share of their 8 registrations whose register status reads “Completed” (TN-wide: 81%) — note this naturally tracks portfolio age; a builder whose projects are mostly recent will show a low share without it meaning delay. Deadline extended: share with a recorded completion-date extension or “Extension given” status (TN-wide: 0%). Past date, not completed: projects whose RERA-committed date has passed without a “Completed” status, of 6 with a known committed date. Avg committed timeline: mean months between registration and committed completion, where both dates are on record. Disclosure completeness: share of key filing fields (stage, building type, site extent, planning permission, units, completion date) present on the detailed register — sampled for 1 of 8 projects.Approval → RERA: median months between the planning-approval document date (OCR'd from the filed approval) and RERA registration, across 4 projects where both dates are readable.

All TNRERA registrations by M/s. G.P. HOMES (P) LTD.

ProjectRERA No.LocalityYearCommitted byUnits
AURA TN/11/Building/0245/2025 Coimbatore District 2025 31 Jul 2028 16
Construction of Stilt Floor + 5 Floors TN/29/Building/0037/2022 North Chennai 2022 3 Feb 2025 77
VGN Mahalakshmi Nagar Phase-XIII TN/02/Layout/0114/2021 Poonamallee Corridor 2021 DONE
GP Peach Bloosom TN/02/Building/0036/2020 Ambattur–Avadi Belt 2020
VGN Southern Meadows Phase-IV TN/01/Layout/0022/2020 Sriperumbudur–Oragadam 2020 31 Jan 2021 DONE
VGN Highness TN/01/Layout/0078/2020 Porur Belt 2020 31 Mar 2021 DONE
VGN CH 40 TN/02/Layout/0201/2019 Thiruvallur District 2019 30 Nov 2020
VGN Windsor Park Phase-IV TN/02/Layout/0214/2019 Poonamallee Corridor 2019 30 Nov 2020 DONE

How to read this record

Does M/s. G.P. HOMES (P) LTD. deliver on time?

No completion-deadline extensions are recorded across their 8 registered projects — a clean register on this measure.

Where does M/s. G.P. HOMES (P) LTD. build?

Their registrations concentrate in Poonamallee Corridor, Ambattur–Avadi Belt, North Chennai, Thiruvallur District, Sriperumbudur–Oragadam.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this builder featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.