VerifyRERAEvery project's full RERA record. Verified in seconds.
Home/Builders/M/s. Casa Grande Coimbatore LLP, Shri Dwaraka

M/s. Casa Grande Coimbatore LLP, Shri Dwaraka

M/s. Casa Grande Coimbatore LLP, Shri Dwaraka has 4 projects on the TNRERA register since 2017 — 159 units/plots in total, concentrated in Coimbatore District. 0 completion-deadline extensions are recorded across their projects, and 4 projects are past their committed completion dates on the register. All figures from TNRERA public records.

4
2017
159
0

Builder Performance Dashboard

Computed from TNRERA register entries only — every metric's method is stated below it. Register status can lag reality; treat as one research input.

100%
0%
0
29 mo

Marked completed: share of their 4 registrations whose register status reads “Completed” (TN-wide: 81%) — note this naturally tracks portfolio age; a builder whose projects are mostly recent will show a low share without it meaning delay. Deadline extended: share with a recorded completion-date extension or “Extension given” status (TN-wide: 0%). Past date, not completed: projects whose RERA-committed date has passed without a “Completed” status, of 4 with a known committed date. Avg committed timeline: mean months between registration and committed completion, where both dates are on record.

All TNRERA registrations by M/s. Casa Grande Coimbatore LLP, Shri Dwaraka

ProjectRERA No.LocalityYearCommitted byUnits
Construction of Stilt floor + 4 floors TN/11/Building/0113/2018 Coimbatore District 2018 31 Dec 2020 12 DONE
Construction for Group Development of 3 Blocks, Block-1 – Ground floor + 1st Floor TN/11/Building/0114/2018 Coimbatore District 2018 31 Dec 2020 9 DONE
Construction for Group Development of Block 1 to 12 with Ground Floor+ First Floor - 78 Vi TN/11/Building/0214/2017 Coimbatore District 2017 31 Mar 2020 134 DONE
Construction of Stilt Floor+ 4 Floors TN/11/Building/0226/2017 Coimbatore District 2017 30 Nov 2019 4 DONE

How to read this record

Does M/s. Casa Grande Coimbatore LLP, Shri Dwaraka deliver on time?

No completion-deadline extensions are recorded across their 4 registered projects — a clean register on this measure.

Where does M/s. Casa Grande Coimbatore LLP, Shri Dwaraka build?

Their registrations concentrate in Coimbatore District.

Get the full dossier (PDF)

A downloadable, builder-level RERA dossier with this builder featured — the health score explained, the builder's complete track record against the Tamil Nadu benchmark, a carpet-area annexure, the full portfolio, a chronology and links to the government source documents.

Download the dossier →

Shortlisting here? Verify before you pay.

We check title and RERA standing, benchmark the price against registration data, and negotiate with the builder on your side. Free first consultation.